New construction at Spanish Fork Municipal Airport and the largest hangar at Patey Aviation Park, with 11,700 SF of column-free hangar space and a 3,360 SF private amenity suite-built for an owner who needs serious aircraft capacity and a true base of operations. THE HANGAR 11,700 SF column-free hangar with a 70' wide 24' high hydraulic door, 24' clear opening and 25'30' eave height. PRIVATE AMENITY SUITE 3,360 SF finished suite over two levels with a kitchenette, restroom and flexible space to customize for your needs. (15,060 total SF in hangar + amenity). INCLUDED Dedicated 200A single phase electrical service, ceiling-mounted gas unit heater, LED lighting, fire alarm, 2-hour demising walls, hose bib, floor drain and sewer. Pre-engineered insulated steel construction with 4" slab over vapor barrier. OWNERSHIP Own the building on a 50-year Spanish Fork City ground lease. 2026 ground rent is $0.67/SF/year and is set annually by City Council. Property tax applies to the structure only; ground lease transfers with the hangar. THE FIELD Direct taxiway access to Spanish Fork Municipal Airport's 6,500' lighted runway. 4,529' MSL, uncontrolled field, CTAF 122.9. Jet A available through the FBO. Secured perimeter with badge access and 24/7 owner entry. Approximately 10 minutes to Provo and under an hour to Salt Lake City. Estimated completion: Summer 2027.